How to figure concrete by hand
Concrete is sold by the cubic yard. Find the cubic feet of the pour, divide by 27, and add a little for waste. The calculator above does exactly this, but it helps to know the math when you are standing on the job with a tape.
Slab, patio, driveway or sidewalk
Cubic yards = length (ft) × width (ft) × thickness (in) ÷ 12 ÷ 27
Worked example. A 20 × 20 garage slab at 4 inches: 20 × 20 × 4 ÷ 12 = 133.3 cubic feet. Divide by 27 and you get 4.94 yards. Add 10 percent for waste and order 5.5 yards.
Round pad or circle
Cubic yards = 3.1416 × (diameter (ft) ÷ 2)² × thickness (in) ÷ 12 ÷ 27
A 12 foot round hot tub pad at 4 inches is 3.1416 × 6 × 6 × 0.333 = 37.7 cubic feet, or 1.40 yards before waste.
Wall
Cubic yards = length (ft) × height (ft) × thickness (in) ÷ 12 ÷ 27
A 20 foot wall, 8 feet tall and 8 inches thick, is 106.7 cubic feet, or 3.95 yards. Walls also need forms on both faces, so the calculator shows that area too. For the footing under the wall, use the footing calculator. For round piers, use the sonotube calculator.
Yards for common slab sizes
Exact yards, before waste. Add 5 to 10 percent when you order.
| Slab | 4 in thick | 5 in thick | 6 in thick |
|---|---|---|---|
| 10 × 10 ft | 1.23 CY | 1.54 CY | 1.85 CY |
| 12 × 12 ft | 1.78 CY | 2.22 CY | 2.67 CY |
| 10 × 20 ft | 2.47 CY | 3.09 CY | 3.70 CY |
| 12 × 24 ft | 3.56 CY | 4.44 CY | 5.33 CY |
| 20 × 20 ft | 4.94 CY | 6.17 CY | 7.41 CY |
| 24 × 24 ft | 7.11 CY | 8.89 CY | 10.67 CY |
| 30 × 30 ft | 11.11 CY | 13.89 CY | 16.67 CY |
How many bags make a yard
Each bag says how much concrete it makes. These are the usual numbers for premixed bags. Divide the cubic feet of your pour by the yield, and round up.
| Bag size | Makes about | Bags per cubic yard |
|---|---|---|
| 80 lb | 0.60 cu ft | 45 |
| 60 lb | 0.45 cu ft | 60 |
| 40 lb | 0.30 cu ft | 90 |
A 10 × 10 slab at 4 inches is 33.3 cubic feet: 56 bags of 80 lb, 75 of 60 lb or 112 of 40 lb, before waste. Past about a yard, mixing that by hand is a long day, and a ready-mix truck is usually cheaper and gives you one even pour.
How thick should it be?
| Job | Typical thickness |
|---|---|
| Sidewalk, patio, shed floor | 4 in |
| Garage floor | 4 to 5 in |
| Driveway, cars and pickups | 4 to 5 in |
| Driveway, RVs or heavy trucks | 6 in |
| Thickened edge on an outside slab | 8 to 12 in deep at the edge |
Always go by the plans or local code when there are any. These are common starting points, not engineering.
Before you call the plant
Order a little over, not under. Ground is never perfectly flat and forms move. Being half a yard short with a slab half finished is the worst day in concrete. Ten percent over is normal on dug ground.
Round up to the quarter yard. Most plants sell in quarter or half yard steps, so the calculator rounds your order up for you.
Ask about short load fees. Small orders often carry an extra charge per truck. If you have two small pours close together, pour them the same day. More on that in what a short load fee is.
Know your mix. Tell the plant the strength (PSI) you need and what it is for. See which PSI to order.
For more detail, read how much concrete do I need, or see what the yards cost at your plant with the concrete cost calculator.
More free calculators
Free templates
Common questions
When the job needs more than yards.
This page gives you the volume. ConCal gives you the rebar, the labor, the markup and a bid you can send.
$44/mo · 14-day trial